¸

The Pelješac bridge final superstructure segment will be installed on July 28th

20.07.2021
photo

Over 2400 m long multi-span extradosed cable-stayed bridge with orthotropic steel deck will be one of the largest European bridges.

The client Hrvatske ceste d.o.o. signed the contract for construction with China Road and Bridge Corporation (CRBC) in 2018.

The author of architectural and structural bridge concept and the Main Designer is Marjan Pipenbaher. The design of the bridge was prepared by Joint Venture Pipenbaher Consulting Engineers, Ponting and Faculty of civil engineering from Zagreb.