Location: Valley Railway Section A-3-2, Israel
Investor: State of Israel, Ministry of Transport
Client:
SHAPIR CIVIL & MARINE ENGINEERING LTD.
Y. D. Y. KATS ENGINEERS Ltd., Israel
Designer:
PONTING - PIPENBAHER CONSULTING ENGINEERS
Services: Preliminary / Final / Detailed design
Length: 719.4 m
Span arrangement: 55.0 + 9 x 67.6 + 53.0 = 719.4 m
Total width: 7.20 m
Pier height: Up to 17.5 m
Type of foundations:
Deep on bored RC piles, diameter 1.20 m
Superstructure: Prestressed concrete box girder
Construction technology: Balanced cantilever method