¸

Bridge over the Danube river in Linz

Linz, Austria

Bridge over the Danube river in Linz

Location:   Linz, Austria
Investor/Client:   ASFINAG Wien / Linz Municipality
Client:   Linz Municipality
Designer:
PONTING - PIPENBAHER CONSULTING ENGINEERS
ÖHLINGER + PARTNER INGENIEURE
Zeininger Architekten, Wien
Services:   Competition design - 2nd prize
 
Length:   396.0 m
Span arrangement:
44.0 + 2 x 64.0 + 132.0 + 64.0 + 28.0 = 396.0 m
Total width:   39.8 m
Arch span:   132 m
Pier height:   Up to 13.0 m
Type of foundations:
Deep foundation on RC piles, diameter of 1.20 m
Superstructure:   Composite box girder
Construction technology:   Incremental launching method

related projects