Location:
Motorway A5 Beli Manastir – Osijek – Svilaj; Section: Sredanci – Border BiH / Croatia & BiH
Investor: HRVATSKE CESTE d.o.o., Zagreb, Croatia
Client: STRABAG AG, Vienna, Austria
Designer:
PONTING - PIPENBAHER CONSULTING ENGINEERS
Services: Alternative bidding design
Length: 640.0 m
Span arrangement:
75.0 + 95.0 + 3 x 100.0 + 95.0 + 75.0 = 640.0 m
Total width: 27.5 m
Pier height: Up to 17.1 m
Type of foundations:
Deep foundation on RC piles, diameter of 1.20 m
Superstructure: Composite superstructure
Construction technology: Incremental launching method