Location:
Highway corridor Vc - Zenica bypass, Bosnia and Herzegovina
Investor: BIH, Ministry of transport and communication
Client: TZI INŽENJERING d.o.o., BIH
Designer:
PONTING - PIPENBAHER CONSULTING ENGINEERS
Services: Preliminary / Final / Tender design
Length: 405.3 + 380.7 m
Span arrangement:
119.1 + 166.8 + 119.3 = 405.2 m
108.9 + 163.2 + 108.7 = 380.8 m
Total width: 13.8 m
Pier height: Up to 78.0 m
Type of foundations: Deep on wells
Superstructure: Prestressed concrete box girder
Construction technology: Balanced cantilever method