Location | Highway Ljubljana – Karavanke Tunnel, Slovenia |
Investor | DARS d.d., Celje Motorway Company in the Republic of Slovenia |
Client | PRIMORJE d.d., Ajdovščina, Slovenia |
Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
Services | Preliminary / Final / Detailed design |
Length | 2 x 370.0 m |
Span arrangement | 75.0 + 110.0 + 110.0 + 75.0 = 370.0 m |
Total width | 14.80 m |
Pier height | Up to 55.0 m |
Type of foundations | Deep on 21 m deep wells, diameter 10.0 m |
Superstructure | Prestressed concrete box girder |
Construction technology | Balanced cantilever method |
Competition | 1.st Prize |