LocationHighway Ljubljana – Karavanke Tunnel, Slovenia
InvestorDARS d.d., Celje
Motorway Company in the Republic of Slovenia
ClientPRIMORJE d.d., Ajdovščina, Slovenia
DesignerPONTING - PIPENBAHER CONSULTING ENGINEERS
ServicesPreliminary / Final / Detailed design
Length2 x 370.0 m
Span arrangement75.0 + 110.0 + 110.0 + 75.0 = 370.0 m
Total width14.80 m
Pier heightUp to 55.0 m
Type of foundationsDeep on 21 m deep wells, diameter 10.0 m
SuperstructurePrestressed concrete box girder
Construction technologyBalanced cantilever method
Competition1.st Prize