Location:
Highway Ljubljana – Karavanke Tunnel, Slovenia
Investor:
DARS d.d., Celje
Motorway Company in the Republic of Slovenia
Client: PRIMORJE d.d., Ajdovščina, Slovenia
Designer:
PONTING - PIPENBAHER CONSULTING ENGINEERS
Services: Preliminary / Final / Detailed design
Length: 2 x 370.0 m
Span arrangement: 75.0 + 110.0 + 110.0 + 75.0 = 370.0 m
Total width: 14.80 m
Pier height: Up to 55.0 m
Type of foundations:
Deep on 21 m deep wells, diameter 10.0 m
Superstructure: Prestressed concrete box girder
Construction technology: Balanced cantilever method
Competition - 1.st Prize