Location:
Highway Ljubljana – Karavanke Tunnel, Slovenia
Investor/Client:
DARS d.d., Celje
Motorway Company in the Republic of Slovenia
Designer:
PONTING - PIPENBAHER CONSULTING ENGINEERS
Services: Preliminary / Final design
Length: 373.41 m
Span arrangement:
55.25 + 71.6 + 72.82 + 101.24 + 72.5 = 373.41 m
Total width: 14.90 m
Pier height: Up to 56.7 m
Type of foundations:
Shallow foundations, restrained with 10 m long micro-piles of diameter 40 cm
Superstructure: Composite superstructure
Construction technology:
Incremental launching method (steel part of superstructure)