| Location | Highway Ljubljana – Karavanke Tunnel, Slovenia |
| Investor | DARS d.d., Celje Motorway Company in the Republic of Slovenia |
| Client | PRIMORJE d.d., Ajdovščina, Slovenia |
| Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
| Services | Preliminary / Final / Detailed design |
| Length | 2 x 370.0 m |
| Span arrangement | 75.0 + 110.0 + 110.0 + 75.0 = 370.0 m |
| Total width | 14.80 m |
| Pier height | Up to 55.0 m |
| Type of foundations | Deep on 21 m deep wells, diameter 10.0 m |
| Superstructure | Prestressed concrete box girder |
| Construction technology | Balanced cantilever method |
| Competition | 1.st Prize |
















