| Location | Highway Elazig - Malatya, Turkey |
| Investor | Republic of Turkey; Ministry of transport and communication |
| Client | YÜKSEL PROJE ULUSLARARASI A.Ş. , Ankara, Turkey |
| Designer / Independent Check Engineer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
| Services | Conceptual / Preliminary design / Independent check of Final design |
| Length | 660.0 m |
| Span arrangement | 180.0 + 380.0 + 50.0 + 50.0 = 660.0 m |
| Total width | 25.0 m |
| Total pylon height | 168.5 m |
| Type of foundations | Deep on wells |
| Superstructure | Steel orthotropic box girder – main span |
| Prestressed concrete box – side spans | |
| Construction technology | Balanced cantilever method |

















