| Location | Elazig, Turkey |
| Investor | REPUBLIC OF TURKEY MINISTRY OF TRANSPORT AND INFRASTRUCTURE GENERAL DIRECTORATE OF HIGHWAYS |
| Client | |
| Designer | SUNKO PROJE - PIPENBAHER CONSULTING ENGINEERS |
| Services | Preliminary design / Consultancy services |
| Suspension Bridge | |
| Length | 1840.0 m |
| Span arrangement | 380.0 + 1080.0 + 380.0 = 1840.0 m |
| Total width | 28.3 m |
| Total pylon height | 163.0 m |
| Type of foundations | Deep on wells and Anchor Blocks |
| Superstructure | Steel orthotropic superstructure |
| Cable-stayed Bridge | |
| Length | 1840.0 m |
| Span arrangement | 60.0 + 71.0 + 3 x 83.0 + 1080.0 + 3 x 83.0 + 71.0 + 60.0 = 1840.0 m |
| Total width | 26.0 |
| Total pylon height | 280.0 m |
| Type of foundations | Deep on wells and RC piles |
| Superstructure | Steel orthotropic box girder – main span |
| Prestressed concrete box – side spans |











