| Location | West ring road – Novo mesto, Slovenia |
| Client | Ministry of Infrastructure, Directorate of the Republic of Slovenia for Infrastructure |
| Designer | PIPENBAHER CONSULTING ENGINEERS |
| ATELIERarhitekti d.o.o. | |
| Services | Competition design – 1st prize |
| Highway Bridge | |
| Length | 500 m |
| Span arrangement | 50+84.5+145+84.5+50+43.5 m |
| Total width | 11.525 + 11.925 = 23.40 m |
| Type of foundations | Deep foundation on RC piles |
| Superstructure | Prestressed concrete box girders |
| Construction technology | Balanced cantilever method / span by span |
| Pedestrian Bridge | |
| Length | 174 m |
| Span | 145 m |
| Total width | 4.74 m |
| Bridge type | Composite Bridge |




















