Location | Motorway A5 Beli Manastir – Osijek – Svilaj; Section: Beli Manastir – Osijek / Croatia |
Investor | HRVATSKE CESTE d.o.o., Zagreb, Croatia |
Client | VIADUKT d.d., Zagreb, Croatia |
Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
Services | Conceptual design |
Length | 2485.2 m |
Span arrangement | 25.3 + 30.0 + 15 x 35.0 + 30.0 + 25.3 + 4.0 + 36.0 + 9 x 45.0 + 94.0 + 220.0 0 + 94.0 +9 x 45.0 +36.0 + 4.0 + 21.3 + 27.0 + 13 x 35.0 + 27.0 + 21.3 = 2485.2 m |
Total width | 2 x 13.3 / 28.0 m |
Total pylon height | 65.5 m |
Type of foundations | Deep foundation on RC piles, diameter of 1.20 m |
Superstructure | Composite steel - concrete structure |
Construction technology | Incremental Launching method |