| Location | Second track of the Divača - Koper Railway alignment, section Črni Kal – Koper, Slovenia |
| Investor/Client | Ministry of Infrastructure, Slovenian Infrastructure Agency |
| Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
| Services | Preliminary / Final / Tender design |
| Length | 215.0 m |
| Span arrangement | 70.0 + 45.0 + 100.0 = 215.0 m |
| Total width | 16.25 m |
| Pier height | 10.0 m |
| Type of foundations | Deep on bored RC piles, diameter 1.20 m |
| Superstructure | Prestressed concrete hollow-box shaped girder (railway line inside structure) |
| Construction technology | Cast in Situ |