| Location | Second track of the Divača - Koper Railway alignment, section Črni Kal – Koper, Slovenia |
| Investor/Client | Ministry of Infrastructure, Slovenian Infrastructure Agency |
| Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
| Services | Preliminary / Final / Tender design |
| Length | 424.0 m |
| Span arrangement | 52.0+ 5 x 64.0 + 52.0 = 424.0 m |
| Total width | 10.45 m |
| Pier height | Up to 64.0 m |
| Type of foundations | Deep on wells, diameter 10 m |
| Superstructure | Prestressed concrete U-shape girder |
| Construction technology | Incremental launching method |



















