Location | Budapest, Hungary |
Client | Budapest Municipality |
Designer | PIPENBAHER CONSULTING ENGINEERS |
SPECIALTERV EPITOMERNOKI Kft | |
BRIGHT FIELD STUDIOS | |
Services | Competition design – PURCHASE PRIZE |
Length | 753.5 m |
Span arrangement | Approach bridge: 30.0 + 45.5 + 2 x 38.0 + 33.0 = 184.50 m |
River bridge - Self-Anchorage Suspension Bridge: 48.0 + 162.0 + 306.0 + 48.0 = 564.0 m | |
Total width | 49.88 m |
Pylon height | 106.5 m – total / 80.0 m above the bridge deck |
Type of foundations | Deep foundation on bored RC piles, diameter of 1.50 m |
Superstructure | Twin post-tensioned RC hollow box structures (end spans) |
Twin orthotropic steel hollow box structure (main spans) | |
Construction technology | Incremental launching method, Cast In Situ |