| Location | Haifa, Israel |
| Investor | YEFE NOF, Haifa, Israel |
| Client | TERRE ARMEE Ltd., Israel |
| Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
| Services | Preliminary / Final / Detailed design |
| Length | 2 x 207.0 m |
| Span arrangement | 57.5 + 92.0 + 57.5 = 207.0 m |
| Total width | 11.0 m and 11.5 – 13.1 m |
| Pier height | Up to 28.0 m |
| Type of foundations | Deep on massive concrete blocks |
| Superstructure | Prestressed concrete box girder |
| Construction technology | Balanced cantilever method |