| Location | Highway corridor Vc - Zenica bypass, Bosnia and Herzegovina |
| Investor | BIH, Ministry of transport and communication |
| Client | TZI INŽENJERING d.o.o., BIH |
| Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
| Services | Preliminary / Final / Tender design |
| Length | 405.3 + 380.7 m |
| Span arrangement | 119.1 + 166.8 + 119.3 = 405.2 m |
| 108.9 + 163.2 + 108.7 = 380.8 m | |
| Total width | 13.8 m |
| Pier height | Up to 78.0 m |
| Type of foundations | Deep on wells |
| Superstructure | Prestressed concrete box girder |
| Construction technology | Balanced cantilever method |