Location | Highway corridor Vc - Zenica bypass, Bosnia and Herzegovina |
Investor | BIH, Ministry of transport and communication |
Client | TZI INŽENJERING d.o.o., BIH |
Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
Services | Preliminary / Final / Tender design |
Length | 405.3 + 380.7 m |
Span arrangement | 119.1 + 166.8 + 119.3 = 405.2 m |
108.9 + 163.2 + 108.7 = 380.8 m | |
Total width | 13.8 m |
Pier height | Up to 78.0 m |
Type of foundations | Deep on wells |
Superstructure | Prestressed concrete box girder |
Construction technology | Balanced cantilever method |