Location | Highway A2 – Karavanke Tunnel - Obrežje, Slovenia |
Investor | DARS d.d., Celje Motorway Company in the Republic of Slovenia |
Client | PRIMORJE d.d., Slovenia |
Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
Services | Preliminary / Final / Detailed design |
Length | 2 x 324.0 m |
Span arrangement | 46.0 + 4 x 58.0 + 46.0 = 324.0 m |
Total width | 14.8 m |
Pier height | Up to 44.0 m |
Type of foundations | Deep on bored RC piles, diameter 1.50 m |
Superstructure | Prestressed concrete box girder |
Construction technology | Incremental launching method |