Project | Kömürhan Bridge, Turkey |
Location | Highway Elazig - Malatya, Turkey |
Investor | Republic of Turkey; Ministry of transport and communication |
Client | YÜKSEL PROJE ULUSLARARASI A.Ş. , Ankara, Turkey |
Expert | PIPENBAHER CONSULTING ENGINEERS |
Special Services | Computational fluid dynamics (CFD) analysis |
Bridge Dynamic Wind Analysis | |
Length | 660.0 m |
Span arrangement | 180.0 + 380.0 + 50.0 + 50.0 = 660.0 m |
Total width | 25.0 m |
Total pylon height | 168.5 m |
Type of foundations | Deep on wells |
Superstructure | Steel orthotropic box girder – main span |
Prestressed concrete box – side spans | |
Construction technology | Balanced cantilever method |