Project | Pelješac Bridge, Croatia |
Location | Highway Split – Ploče – Dubrovnik, Croatia |
Investor/Client | HRVATSKE CESTE d.o.o., Zagreb, Croatia |
Expert | PIPENBAHER CONSULTING ENGINEERS |
Special Services | Computational fluid dynamics (CFD) analysis |
Bridge Dynamic Wind Analysis | |
Coordination of wind-tunnel tests | |
Wind protection design | |
Navigation channel | 200 x 55 m |
Length | 2404.0 m |
Span arrangement | 72.0 + 96.0 + 118.0 + 203.5 + 5 x 285.0 + 203.5 + 118.0 + 96.0 + 72.0 = 2404.0 m |
Total width | 23.60 m |
Total pylon height | 82.5 – 98.0 m |
Type of foundations | Deep on driven steel piles, D = 2.0 m, length up to 124 m |
Superstructure | Steel orthotropic superstructure |
Construction technology | Balanced cantilever method |