ProjectRailway Viaduct Vinjan, Slovenia
LocationSecond track of the Divača - Koper Railway alignment, section Črni Kal – Koper, Slovenia
Investor/ClientMinistry of Infrastructure, Slovenian Infrastructure Agency
ExpertPIPENBAHER CONSULTING ENGINEERS
Special ServicesComputational fluid dynamics (CFD) analysis
Bridge Dynamic Wind Analysis
Length620.0 m
Span arrangement60.0+ 80.0 + 4 x 100.0 + 80.0 = 620.0 m
Total width9.60 m
Pier heightUp to 55.0 m
Type of foundationsDeep on wells, diameter 10 m, depth 12.0 - 36.0 m
SuperstructurePrestressed concrete box girder
Construction technologyBalanced cantilever method