Project | Railway Viaduct Gabrovica, Slovenia |
Location | Second track of the Divača - Koper Railway alignment, section Črni Kal – Koper, Slovenia |
Investor/Client | Ministry of Infrastructure, Slovenian Infrastructure Agency |
Expert | PIPENBAHER CONSULTING ENGINEERS |
Special Services | Deep foundation analysis |
Specialized geotechnical analysis | |
Length | 424.0 m |
Span arrangement | 52.0+ 5 x 64.0 + 52.0 = 424.0 m |
Total width | 10.45 m |
Pier height | Up to 64.0 m |
Type of foundations | Deep on wells, diameter 10 m |
Superstructure | Prestressed concrete U-shape girder |
Construction technology | Incremental launching method |