LocationHighway Section D4 Jarovce – Ivanka Sever,
Bratislava, Slovakia
InvestorSlovenská republika - Ministerstvo dopravy, výstavby a regionálneho rozvoja Slovenskej republiky Bratislava, Slovenská republika
ClientSTRABAG AG, Vienna, Austria
DesignerPONTING - PIPENBAHER CONSULTING ENGINEERS
ServicesPreliminary - Biding design
Length827.4 + 5.0 + 1000.0 + 5.0 + 1189.0 = 3026.4 m
Span arrangement39.0 + 53.0 + 2 x 55.0 + 7 x 60.0 + 3 x 55.0 + 40.4 = 827.4 m
140.0 + 220.0 + 140.0 + 140.0 + 220.0 + 140.0 = 1000.0 m
47.0 + 3 x 55.0 + 11 x 60.0 + 5 x 55.0 + 42.0 = 1189.0 m
Total width36.8 m
Total pylon height82.5 m - 91.0 m
Type of foundationsDeep on bored RC piles, diameter 1.50 m
SuperstructurePrestressed concrete box girder
Construction technologyBridges 204-205, 206-207: Incremental launching method
Main bridge: Balanced cantilever method