| Location | Tel Aviv, Israel |
| Investor | Tel Aviv Metropolitan Area Mass Transit |
| Client | YENON RESEARCH & DESIGN Ltd., Israel |
| Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
| Services | Conceptual / Preliminary design |
| Length | 230.0 m |
| Span arrangement | 95.0 + 135.0 = 230.0 m |
| Total width | 12.4 - 13.0 m |
| Total pylon height | 79.0 m |
| Type of foundations | Deep on bored RC piles, diameter 1.20 m |
| Superstructure | Composite U shape girder |
| Construction technology | Balanced cantilever method |












