Location | Highway Turkmenabat – Farap, Turkmenistan |
Investor | REPUBLIK OF TURKMENISTAN |
Client | VIADUKT d.d., Zagreb, Croatia |
Designer | PONTING - PIPENBAHER CONSULTING ENGINEERS |
Services | Preliminary design / Bidding design |
Length | 2115.0 m |
Span arrangement | 90.0 + 3 x 110.0 + 90.0 + 95.0 + 190.0 + 2 x 420.0 + 190.0 + 95.0 + 60.0 + 75 + 60.0 = 2115.0 m |
Total width | 24.0 m |
Total pylon height | 123 m |
Type of foundations | Deeply on 65 m long bored RC piles, diameter 1.50 m |
Superstructure | Orthotropic steel superstructure |
Construction technology | Incremental Launching method |